Storm Sewer Install — Start to Finish
Storm sewer is the part of a site nobody sees once the lot is paved, which is exactly why it has to be right. These photos are from our storm jobs around the metro, in the order the work goes in.
Scope of Work
- Precast inlets and junction boxes received and set
- Trench cut to depth and line
- Rock bedding under every run
- Pipe laid to plan grade, joints wrapped
- Connections grouted inside the structures
- Backfill compacted in lifts
How to Read It
The 11 photos below come from our jobs around the metro and are put in the order the work happens, so you can follow the job from the first step to the last.
Use the arrows or the thumbnail strip to move through the stages. Each caption says what that frame is showing and why it mattered to the ones that came after it.
The Work, Stage by Stage
Every stage in order, with what it shows and why it mattered.


Precast arrives — 1 of 11
Precast boxes arrive on the trailer. Each one is checked against the plan before it comes off the truck.
What Matters on Jobs Like This
Compaction you can count on
Backfill goes back in lifts over the pipe, and we use soil engineering to guarantee compaction. That is what keeps the lot over a storm trench from settling after it is paved.
Grade checked before it is covered
Pipe set off grade holds water and silt, and you only find out after the lot is paved. Every run is checked against the plan before backfill.
Joints wrapped, connections grouted
Unsealed joints let fines wash into the pipe and leave voids that turn into sinkholes. Joints are wrapped and every connection inside the boxes is grouted.
Tight sites next to live traffic
A lot of metro storm work happens beside open streets and businesses. Junction boxes and tie-ins get set with the staging and traffic control the site needs.
Services in This Walk-Through
Every line of the scope above sits under one of these headings. Most commercial jobs pull from several of them at once.

Storm Sewer
Pipe, inlets and junction boxes set to plan grade, sealed, and backfilled before the paving goes down.
Learn more
Earthwork
Cut, fill and rough grade to the civil plan, so every trade after us starts on time.
Learn more
Subgrade Preparation
Pads and paving subgrade built in lifts, at grade and at density, ready for the testing lab.
Learn moreGot a commercial pad or lot to build?
Contact Us Directly
Prefer to call or email instead of filling out the form? Reach us directly:
Phone
(405) 265-8749Hours
- Monday – Friday8:00 AM – 5:00 PM
- Saturday9:00 AM – 5:00 PM
- Sunday12:00 PM – 4:00 PM
Service Area
Oklahoma & surrounding states. We travel 3–5 hours for commercial sites.